Advertise Here [728 W x 90 H pixels]

Construction & Infrastructure News

Built to Suit

April 2016

Being a cost-effective and timely solution, PEB is gaining popularity, with immense opportunities on the anvil. A33-storey tower built in 99 days; a ...

PEB, Bhasin Group, SS Bhasin, HCL, CN Raghavendran, CR Narayana Rao (Consultants) Pvt Ltd, D Raju, Kirby Building Systems India Pvt Ltd, Alakesh Roy, Zamil Steel, Manish Garg, Everest Industries Ltd, Gautam Suri, Interarch Building Products Pvt Ltd, RCC Building

Everest Constructs 4.5 lakh sq ft Auto Expo venue in record 180 Days

February 2016

Everest Steel Building Solutions, the pre-engineered building division of Everest Industries Ltd, took just 180 days to build a 4.5 lakh sq ft world ...

Everest Steel Building Solutions, Pre-engineered building, Everest Industries Ltd, Manish Sanghi, PUF panels, IEML, Make in India

Ever Metallic

October 2015

Manish Garg, President & CEO-Everest Steel Building Solutions, Everest Industries Ltd, brings with him the distinction of having been involved in the...

Manish Garg, Steel Building Solutions, Everest Industries Ltd, Distinction, Metal Building, Saint Gobain Building Systems, Interarch Building Products, ESBS, Tata Nano car plant, Delhi Airport Terminal T3

Everest Industries

August 2015

Incorporated in 1934, Everest Industries offers a complete range of building solutions such as roofing, ceiling, wall, fl ooring and cladding and pre...

Manish Sanghi, Everest Industries Ltd, Pre-Engineered Steel Buildings
1 
Advertise Here [300 W x 250 H pixels]
Advertise Here [728 W x 90 H pixels]