Advertise Here [728 W x 90 H pixels]

Construction & Infrastructure News

Paras thermal plant achieves 97 per cent plant load factor

June 2016

The Unit-3 of Paras thermal station, Mahagenco, which has an installed capacity of 250 MW, generated 174 MU of power, while the Unit-4, with a capaci...

Paras thermal station, Mahagenco, Electricity, Power generation
1 
Advertise Here [300 W x 250 H pixels]
Advertise Here [728 W x 90 H pixels]