Requirement of about 17 TBMs for Mumbai Metro Line 3 |
April 2017
|
Traversing through congested areas, Mumbai Metro Line 3 is expected to be the next lifeline for the city. Daily ridership is expected to be 17 lakh p...
|
Mumbai Metro Line, passengers, Civil construction, Heavy-duty crane, Telecommunication, Automatic fair collection machines, Waterproofing materials, OHE, Ashwini Bhide, Mumbai Metro Rail Corporation
|
Advertise Here [300 W x 250 H pixels]
Advertise Here [728 W x 90 H pixels]
© COPYRIGHT 2014 ASAPP Media Pvt. Ltd. All Right Reserved.
Disclaimer