Advertise Here [728 W x 90 H pixels]

Construction & Infrastructure News

Kakrapar atomic power station recovery in three to eight months

May 2016

The Kakrapar Atomic Power Station (KAPS) Unit-1 in Gujarat, which has been shutdown since March due to radioactive leak, may still take nearly three-...

Kakrapar Atomic Power Station, Radioactive leak, Pressurised Heavy Water Reactor, Coolant system
1 
Advertise Here [300 W x 250 H pixels]
Advertise Here [728 W x 90 H pixels]