Advertise Here [728 W x 90 H pixels]
Construction : Around the world | October 2015 | Source : Equipment India

Liebherr LTM 1300-6.2 erects bridge overnight

The motorway section of the A3 between Cologne-Mülheim and Leverkusen is being expanded to eight lanes. However, since the old motorway bridges are not long enough for the expansion, new bridges are needed. As a temporary solution during the construction work, a Liebherr LTM 1300-6.2 mobile crane was used by the company HKV Schmitz + Partner to erect a makeshift bridge overnight. The work had to be completed within a narrow time window. Liebherr LTM 1300-6.2 ensured a smooth and fast operation.
 
Advertise Here [728 W x 90 H pixels]