Advertise Here [728 W x 90 H pixels]

Construction & Infrastructure News

Kudankulam-1 crosses installed capacity

July 2016

Unit-I of the Kudankulam Nuclear Power Plant in Tamil Nadu crossed its installed capacity and generated 1,006 MW of power. ...

Kudankulam Nuclear Power Plant, Tamil Nadu, Russia, Commercial power generation

Maharashtra to buy additional power

July 2016

The state government has decided to buy 1,500 MW of additional power from Maharashtra State Power Generation Co (MahaGenco). ...

State government, Power, Maharashtra State Power Generation Co, Hydro power, Maharashtra Government, Thermal generation, Marathwada

Terex adds R350T, R350T forestry models

July 2016

Featuring a 120-hp, turbocharged Tier IV final Cummins QSF3.8 diesel engine, the new Terex Generation 2 (GEN2) R350T ....

Turbocharged Tier, Terex Generation, Peak engine torque, High flow auxiliary hydraulics, Terex compact track loaders

Terex adds R350T, R350T forestry models

July 2016

Featuring a 120-hp, turbocharged Tier IV final Cummins QSF3.8 diesel engine, the new Terex Generation 2 (GEN2) R350T ....

Turbocharged Tier, Terex Generation, Peak engine torque, High flow auxiliary hydraulics, Terex compact track loaders

Paras thermal plant achieves 97 per cent plant load factor

June 2016

The Unit-3 of Paras thermal station, Mahagenco, which has an installed capacity of 250 MW, generated 174 MU of power, while the Unit-4, with a capaci...

Paras thermal station, Mahagenco, Electricity, Power generation

Nuclear energy can meet the gap in power sector, says scientist

June 2016

India┬┤s energy requirement is soaring, expecting to touch 3,128 terawatt hours per year with a minimum per capita requirement of 1,840 Kwh a year. Th...

Energy, Oil importer, Generation, Power, Harnessing nuclear energy

Rs.3,000 cr A YEAR to boost nuclear power sector

June 2016

The government has proposed a budgetary allocation of upto Rs 3,000 crore per annum towards nuclear power generation in the next 15-20 years, to incr...

Nuclear power generation, Investment, PSU, Atomic power projects

Lean Construction Methods

June 2016

DR YAMINI VARMA and DR SUBHASH RASTOGI write on the managerial perspective of lean waste assessment in the Indian construction scenario and share a b...

Dr Yamini Varma, Dr Subhash Rastogi, Construction, Managerial construction wastes, Methodology, Waste generation, waste management system, NFC, BIM, VDC, R&D, NICMAR, Dr Subhash Rastogi, PGPACM
Previous 11 12 13 14 15 16 17 18 19 20  Next 
Advertise Here [300 W x 250 H pixels]
Advertise Here [728 W x 90 H pixels]